MUMODEMS Archives

December 1995

MUMODEMS@LISTSERV.MIAMIOH.EDU

Options: Use Monospaced Font
Show Text Part by Default
Show All Mail Headers

Message: [<< First] [< Prev] [Next >] [Last >>]
Topic: [<< First] [< Prev] [Next >] [Last >>]
Author: [<< First] [< Prev] [Next >] [Last >>]

Print Reply
Subject:
From:
Chris Allison <[log in to unmask]>
Reply To:
Miami's Modems <[log in to unmask]>
Date:
Tue, 12 Dec 1995 15:54:34 EST
Content-Type:
text/plain
Parts/Attachments:
text/plain (342 lines)
    For your information and comment I am including the current installation
schedule as outlined in the contract MU has with NEC.
 
 
 ===========================================================================
 
NETWORK INSTALLATION AND PERFORMANCE SCHEDULE
 
 
 
 
Phase 1:  Hubs and priority buildings
 
      Start:      November 1, 1995
      Completion: August 15, 1996
 
Buildings to include at least, but not limited to, in order of priority;
 
           Bachelor Hall (East Quad)
           Benton Hall (North Quad)
           Gaskill Hall (Central Quad)
           Harrison Hall (Central Quad)
           Hughes Hall Including the Brill Science Library (Central Quad)
           King Library (Central Quad)
           Kreger Hall (Central Quad)
           Phillips Hall (South Quad)
           Shideler Hall (Central Quad)
 
              Installation is to include all relevant (as designed)
              Ethernet transmission equipment, and all work required
              at the station level (voice, data, video jacks and cabling).
              Video electronics may not necessarily work at time of building
              completion during this phase.  Network Operating Center
              software and hardware are to be included
 
 
Phase 2:  Outside plant to hub buildings
 
     Start:      November 1, 1995
     Completion: October 31, 1996
 
     Buildings to include:
 
          Brandon Hall
          Campus Avenue Building
          Dorsey Hall
          Hoyt Hall
          Hughes Hall
          Johnston Hall (Middletown)
          King Library
          Macracken Hall
          Mosler Hall (Hamilton)
          Shriver Center
          Tappan Hall
          Upham Hall
 
            Installation is to include all outside plant to Hub Buildings.
 
Phase 3:  Distance learning classrooms
 
      Start:     November 1, 1995
      Completion:August 15, 1996
 
      Buildings to include:
 
          Gaskill Hall (Oxford)
          Theskin  Hall (Middletown)
          Phelps Hall (Hamilton)
 
              Installation is to include distance learning classrooms
              installed on Hamilton, Middletown, and Oxford campuses.
 
 
Phase 4:  Fourteen upper class residence buildings
 
     Start:      November 1, 1995
     Completion: August 15, 1996
 
     Buildings to include:
 
          Bishop Hall
          Brandon Hall
          Elliott Hall
          Flower Hall
          Hahne Hall
          Hamilton Hall
          Hepburn Hall
          MacCracken Hall
          Martin Dining Hall
          McFarland Hall
          Ogden Hall
          Richard Hall
          Stoddard Hall
          Swing Hall
 
              Installation is to complete work in upper class residence
              halls in North, Central and South Quads.
 
Phase 5:  Video systems external to buildings
 
     Start:     February 1, 1996
     Completion:August 15, 1996
 
 
              Installation is to include the video infrastucture with
              all video transmission equipment required, together with
              video head end and satellite antenna installations.  Video
              infrastructure is defined as those portions of equipment
              which exist external to the actual end point buildings.
 
 
 
Phase 6:  Initial hot hubs
 
     Start:      November 1, 1995
     Completion: August 15, 1996
 
 
     Buildings to include:
 
          Brandon Hall
          Hoyt Hall
          Hughes Hall
          King Library
          Macracken Hall
          Tappan Hall
          Upham Hall
 
         Installation is to include providing, in seven (7) out of the
         twelve (12) hubs, the ability to connect an Ethernet device to
         the hub and maintain an 100 mb/s path to the main network at
         the end of the phase. Each hub shall have the capability of
         receiving two (2), 80 channel broad band video services from the
         head end. (One academic/administrative Service, and one
         entertainment service.)  Optical fiber shall be terminated in
         order to receive the portable reverse feeds from all buildings.
 
 
Phase 7:  Complete hot hubs
 
     Start:      August 16, 1996
     Completion: August 15, 1997
 
 
     Buildings to include:
 
          Campus Avenue Building
          Dorsey Hall
          Johnston  Hall (Middletown)
          Mosler Hall (Hamilton)
          Shriver Cemter
 
          Installation is to include completing the remaining five (5)
          hubs as per the definition in Phase 6. Each hub shall have
          the capability of receiving two (2), 80 channel broad band
          video services from the head end. (One academic /administrative
          Service, and one entertainment service.)  Optical fiber shall
          be terminated in order to receive the portable reverse feeds
          from all buildings.
 
 
Phase 8:  All external work completed
 
     Start:      August 16, 1996
     Completion: August 15, 1997
 
 
             Installation is to include completion of all other remaining
             external work. This completes all trenching, construction, etc.
             outside of the actual buildings.
 
 
Phase 9:  Residence hall completion
 
     Start:      August 16, 1996
     Completion: August 15, 1997
 
 
     Buildings to include:
 
          Alexander Dining Hall
          Anderson Hall
          Clawson Hall
          Collins Hall
          Dennison Hall
          Dorsey Hall
          Emerson Hall
          Erickson Hall
          Harris Dining Hall
          Havighurst Hall
          Mary Lyon Hall
          McBride Hall
          Miami Manor (A, B, C & D)
          Minnich Hall
          Morris Hall
          Peabody Hall
          Porter Hall
          Reid Hall
          Scott Hall
          Stanton Hall
          Symmes Hall
          Tappan Hall
          Thomson Hall
          Wilson Hall
 
              Installation is to include competion of installation in all
              residence halls.  Completion is defined as all buildings
              "jacked" and hot for both Ethernet systems and cable TV.
 
 
Phase 10:  External communications, security, and address administration
 
     Start:      December 1, 1995
     Completion: August 1, 1996
 
 
     Installation is to include:
 
      a)The modem pool (300 modems)
                  Start:      December 1, 1995
                  Completion: August 1, 1996
 
      b)Access security and address administration verification
 
                  Start:      December 1, 1995
                  Completion: August 1, 1996
 
      c)Any pertinent T-1 connections to external data
        communications equipment.
 
 
Phase 11:  Remote campuses
 
              Start:         September 1, 1996
              Completion:    April 1, 1997
 
 
     Buildings to include:
 
          Hamilton Conference Center
          Hamilton Gymnasium
          Mosler Hall
          Phelps Hall and Parrish Auditorium
          Rentschler Library
          Finkelman Auditorium
          Gardner Harvey Library
          Johnston Hall
          Middletown Gymnasium
          Regional Book Depository
          Thesken Hall
          Verity Lodge
 
          Installation to  include completion of all regional campus
          locations. Video systems will be installed as per University
          Technical Officer/NEC design specification.
 
 
Phase 12:  Remaining buildings
 
     Start:      April 1, 1997
     Completion: July 30, 1998
 
 
     Buildings to include:
 
                            Alumni Hall
                            Art Building
                            Art Museum
                            Billings Natatorium (Gymnasium)
                            Pearson Hall (Bio Sciences)
                            Bonham house
                            Boyd Hall
                            Campus Avenue Building
                            Center for Performing Arts
                            Central Food Stores
                            Cole Service Building
                            Cook Place
                            Culler Hall
                            Dodds Hall
                            East End
                            Edwards House
                            Goggin Ice Arena
                            Grey Gables  (formerly Glos)
                            Hall Auditorium
                            Hanna House
                            Health Services Center
                            Hiestand Hall,
                            Hoyt Hall
                            Irvin Hall
                            Joyner House
                            Kelley House
                            Kumler Chapel
                            Langstroth Hall
                            Laws Hall
                            Lewis Place
                            MacMillan Hall
                            Marcum Conference  Center
                            Mayer House
                            McGuffey Hall
                            McKee Hall
                            Miami Inn
                            Millet Assembly Hall
                            Morris House
                            Murstein Alumni Center
                            Old Manse
                            Oxford College
                            Patterson Place
                            Power Plant
                            Presser Hall
                            Recreational Sports Center
                            Robertson Hall
                            Roudebush Hall
                            Rowan Hall
                            Sesquicentennial Chapel
                            Shriver Center
                            Simpson Guest House
                            South Campus Refrigeration Plant
                            Upham Hall
                            Warfield Hall
                            Wells Hall
                            Western Lodge
                            Western Maintenance Buildings
                            Williams Hall
                            Withrow Court
                            Yager Stadium
 
              Installation to include completion of remaining buldings
              in their entirety.  Completion includes all data and video
              systems as per University Technical Officer/NEC design
              specification.
 
 
Phase 13:  Testing and acceptance.
 
     Start:       August 1, 1998
     Completion:  November 1, 1998
 
 
         Work to include final testing and acceptance of all systems.
         Agreement - Data and Video Network Installation Miami University