Hey everyone-
Perhaps I'm forgetting something but didn't their used to be a way to set
the order in which Requirements were checked in the Role-Requirement screen?
Now they just are on or off. If this a change? I'm asking because I'm
setting up a "break windows 98" Requirement and I wanted it to be executed
first rather then have a student potentially run through Updates, AV
installation etc etc and then be told they have to upgrade Windows.
--
Ryan Dorman, CCNP
Network Engineering Specialist
Millersville University
717.871.5883